HFS performed all the architectural and engineering design for the replacement of an overloaded and outdated existing bone marrow unit. The 19,800 SF cancer center was designed for future vertical expansion to seven floors to match the main tower, and this project followed the
planned dynamic. 

 

The project included:

  • Contract drawings and reports

  • Specifications, cost estimate, and construction period services

  • A new 4th floor enclosed bridge structure connected to the main building

  • Bone marrow transplant unit

  • Chemotherapy treatment center

  • Outpatient clinic utilizing PACT Clinical Space Design

​​

The team delivered a patient-centered care facility and capitalized on innovative health care delivery methods.

 

CLIENT: Department of Veterans Affairs

Audie Murphy 4G Cancer Center

San Antonio, Texas