

Temple, Texas
The HFS team designed the relocation, replacement, and reconfiguration of the medium voltage (4160 volts) switchgear on the Temple Veterans' Administration (VA) campus. Planning and design features included analysis of commercial demand and capacity and solar power supply to determine trends in energy requirements.
The project included:
• Horizontal and Vertical Design for new construction
• Construction Phase Services
• Processing Requests for Information
• Department of Defense (DoD) Anti-Terrorism/Fire Protection (AT/FP) design and construction standards
The team overcame issues with the site location and delivered a successful project.
CLIENT: Department of Veterans Affairs